It is interesting to see each persons method of the construction process.
The first hurdle for me to overcome was a firehose. Where does a guy buy a firehose? Nobody in the normal world could help me out with that. Not even firemen. But the Hoseman came to the rescue and shipped me a hose. He didn't even want money for his time. I appreciated his effort and trust with shipping the hose, so I kicked in a little extra for him.
Setting up the hose to hold air took a bit of figuring out. But with time I got that together. Here is the hose together. I tested it and it held the pressure through the night. The gauge read 40psi, but my compressor stated 80psi. I don't know if this is due to the line being split, or if it is 40psi.

The next step that I saw was getting my cores. I decided on maple and birch. Birch for stiffness in the center and near the rails. These are two woods I have seen often and have worked out for me on different projects in the past.
I cut them into strips and aligned them the best I could with the grain as vertical as possible. I then messed it up on layup and put two of the pieces out of order....Oh well.

Now that they are layed up I need to plane them to the desired thickness. I decided to do 12mm in the center and 2mm on the sides. I am doing the platform under foot from center to go 12cm forward and 20cm backward before the angle.
I am trying to make each piece of this construction the best I can so it will last.
Here is the planing jig so far. I plan to clear coat it all so preserve it.

My slow progress is determined by money to buy the next pieces and time to put it together. I will be uploading all of my photos to an album on Picasa that is located here if you would like to look. http://picasaweb.google.com/varnerb/Skis