home | about | howto | articles | SB gallery | user gallery | forum | links  

Photos: Page 09


Titanal


Big Kam (left) and Kelvin preparing to lay-up Daddy's Little Girl.


Kelvin cutting carbon fiber.


Kelvin pouring epoxy over the woodcore during layup.


Gluing an edge to the base material.


Using clamps and a rubber bicycle tire inner tube to epoxy ABS sidewalls to a wood core.



Kelvin inspects the Karbs.

 

  home | about | copyright | disclaimer | contact
SkiBuilders.Com. All Rights Reserved